Big Time验厂质量审核问卷

2018-03-03

Big Time验厂质量方面审核问卷内容包括:

A. Management Responsibilities 管理职责
1.Does the factory has a Quality Policy? Is it posted? Do all the employees know what the policy is or where it is posted? How does the factory measure quality? Do the measurements support the Quality policy of the company?
1.1 What type of reviews of the quality system and quality reports are preformed by management? What actions are taken to correct issues and improve the measures? How are these documented?
1.2 What is the company’s plan to improve quality? Is it re-active or pro-active?
1.3 Does the company have sufficient resources and dedicated resources to measure and drive improvements in quality and productivity?

B. Continuous Improvement BIGTIME验厂持续改进
1.Does the factory measure the quality performance and the projects associated with reducing the defects? How is it communicated to the employees (posted, visuals, meetings, etc.)
1.1 How is the factory driving the improvements and is management involved in the process?
1.2 Review the plan to improve lead time
1.3 Review the communication process. Process must be pro-active and allow sufficient time for BTP to react. (Eg. Notification on the due date that the product is not shipping is not acceptable)
1.4 Review the training program. Does the training provide the operators with the tools and knowledge to improve the process?
1.5 Review the customer complain system. Are the complains recorded? Are actions taken to solve the problems? Does the factory follow up? Are improvements recorded?

C. Quality System(品质体系)
1.Does the factory have a QC Manual? What program does it follow (ISO, QS, Guide 53, etc.)
1.2 Does the factory have a process for design, testing, inspection, sampling, etc and can produce documentation to support this from product launches and production?
1.3 Review the process and documents that the supplier uses to sample products and submit inspection reports (review examples): FMEA, Control Plans, Gauge R&R studies, Sampling and process capability studies
1.4 Have the Key / Critical characteristics been identified and communicated throughout the organization
1.5 How does the factory control updating prints and manufacturing process documents and processes when changes are received from BTP or when approvals are received from BTP acknowledging a change. What processes are in place to notify BTP of changes and to control the processes and product until the changes are approved?
1.6 What methods are used in the factory to solve problems and have employees been trained in the techniques?
1.7 Review the system, how customers are notified of changes and how the approval is obtained.
1.8 Review the inspection reports from prior production, the processes in place to capture the data and verify the measurements.
1.9 See evidence of an internal auditing process Are findings noted? Are corrective actions driven from findings?

D.Purchasing(采购):
1.Does the factory have a supplier certification program for its suppliers?
1.1 Review the process of how the factory specifies and controls the quality of their incoming product from suppliers. Does the factory has a continuity of supply of raw material at stable prices (do they have a sufficient supply of raw material to support production and do they have a plan for fluctuations).
1.2 Is the program based on the quality of service, on time delivery, lead time and price ?
1.3 Does the factory has a program in place to improve the quality of the product and service (for all areas) to BTP and from its suppliers? If not, what are they doing to improve the service to BTP and from their suppliers? How does the factory verify purchased product and is the process adequate to ensure that no defects will go through their system and reach BTP?
1.4 Does the factory require and have material certifications for all critical products used to manufacture parts for BTP? What examples are required in your purchase agreements and what you have on file for specific product.
1.5 How does the factory control changes from/between their suppliers? Look at examples of this process. How does the factory control our tooling in house, at the sub-supplier, and between sub-suppliers? What methods are in place to ensure BTP is notified prior to any tooling movement or modification?
1.6 Review the product control coming into the supplier’s facility. How is it labeled? Is it clear what it is, when it was made, etc? Can the factory segregate and trace the product if a problem is discovered in the process?
1.7 Does the factory has an inventory system? Does the factory do inventory cycle counts to verify inventory accuracy? Does the factory knows supplier lead times and use it for purchasing?
1.8 Does factory has a production forecast? Does factory provide suppliers with the production forecast? Does factory update the forecast periodically? Do they communicate it to their suppliers?

E.Inspection & Test- Process Control(BIGTIME验厂检验和试验过程控制):
1.Does the factory have a process control plan or a process flow charts describing the manufacturing process?
1.1 Are the inspection points identified for the critical specs?
1.2 Is there a documented plan for containment of out of spec product and a reaction plan when out of spec parts are found?
1.3 Does the factory have a documented set up procedure with parameters? How does the factory verify the first piece and during production inspection?
1.4 Are these monitored and recorded during production? What are the reaction plans for out of control and out of spec conditions?
1.5 What is the procedure / process for verifying dies and tooling prior to running?
1.6 Are there scheduled PM sessions or is the tooling verified prior to run or after being removed from a run?
1.7 Does the factory has List Of Materials for the products they make? Are the list of materials accurate to the sales? 
1.8 Can you stop the line in the event that they discover an out of spec or trending condition?
1.9 Is the final product identified properly?

2.How does the supplier ensure that the product is labeled correctly?
2.1 Can the product be traced back to raw materials used?
2.2 Product ID :Part number, manufacturing date, lot number, heat number, P.O. number, etc. Parts should be identified to allow THD to identify groups of defective product.
2.3 Does factory considers the capacity when planning production?
2.4 Does factory considers inventory on hand and orders when planning production? Does factory track daily production?
2.5 Does factory records daily production? Does factory has metrics to monitor scrap and rejected materials and products?
2.6 Are scrap, rejected material and products accounted for and properly disposed of?
2.7 Does factory has a preventive maintenance program that includes daily, weekly and monthly maintenance? Look for night time records.
2.8 Does factory have work instructions? Does the work instruction reflect what the operator is doing?
2.9 Are inspections consistent with the process charts? Are inspection requirement consistent with the process stage of the product? Are in process inspections documented? Is there any metrics of the in process inspections? (Pareto charts, control charts, etc)

3.Does the factory has a procedure to obtain samples from production? Does the procedure describe the inspection and the acceptance criteria? Does the procedure describe a course of action for non conforming/rejected products?
3.1 Does the factory have a finish product inspection procedure in place? Does the procedure define inspection criteria is according to product specifications? Does it includes packaging?
3.2 Are final inspection results recorded?

F.Control of Test Equipment(试验设备的控制):
1.Are the operators trained in the use of the gages? Is there documented evidence of this?
1.1 Will gages and measurement equipment ensure conformance to BTP specs? Are the gages capable of the measurements required (1 decimal place more than the spec)?
1.2 Check several gages for calibration. Check night time records.
1.3 Do you have a calibration schedule?

G. Control of Non-conforming (rejected) Product  (不合格产品的控制拒绝) :
1.1 Is non-conforming product handled? Is it segregated from good product?
1.2 Are the defects recorded and tracked?
1.3 Is there a process for reviewing defective/suspect product?
1.4 Do you have a process to review non conforming products? How do identify, rework, scraps, documentation and corrective actions in place?

H. Corrective & Preventive Action(纠正及预防措施):
2.1 Is there a corrective action system in place to deal with customer issues? Is it the same as the internal system? Is it sufficient to document the issue, correct the problem, and ensure that is does not re-occur?
2.2 Is there a method to ensure that issues do not remain open?
2.3 Are implements corrective actions, verified to be effective?
2.4 Are changes to the process implemented in the daily production?
2.5 Are there training and signoffs for the training?

I. Document Control(Big Time验厂文件控制):
1.1 Do you have a method of controlling your documents, issuing revisions, destroying old documents, etc?
1.2 Is there a document sign off procedure in place? Are all departments involved?

J. Handling, Storage, Packing and Delivery(搬运,储存,包装和交付):
1.1 Do they have a process to identify each part? (handling, storage, packing, and delivery)
1.2 Is there possibility these departments can mix during production?
1.3 Can defective parts , or product be used?
1.4 Is final packing/packaging checked before shipment?
1.5 Do they check to be sure meets BTP spec?
1.6 Do they have a process in place for wrong packing (sticker. Labels ect ) in place to correct problem if occurs?

 

验厂咨询
NBCUniversal验厂咨询 H&M验厂咨询 麦当劳McDonald's验厂咨询 可口可乐验厂咨询 迪卡侬验厂咨询 KFC验厂咨询 BJ's验厂咨询 Big Lots验厂咨询 Kroger验厂咨询 OMEGA验厂咨询 EcoVadis&TFS-CI可持续发展验厂咨询 Michales验厂咨询 New Balance验厂咨询 BSCI验厂咨询 Costco验厂咨询 WCA验厂咨询 C&A验厂咨询 联合利华验厂咨询 PVH验厂咨询 RBA(EICC)咨询 Primark验厂咨询 Lowes验厂咨询 Loreal验厂咨询 CVS验厂咨询 Kohl's咨询 Jcpenney验厂咨询 利丰验厂咨询 VF验厂咨询 Levi's验厂咨询 Adidas验厂咨询 C-TPAT验厂咨询 AVON验厂咨询 TESCO验厂咨询 Sears验厂咨询 Homedepot验厂咨询 Inditex集团验厂 TJX验厂咨询 Target验厂咨询 Disney验厂咨询 Carrefour验厂咨询 Walmart验厂咨询 Sedex验厂咨询 WRAP认证咨询 woolworths验厂咨询 IKEA宜家验厂咨询 Office Depot验厂咨询 Auchan欧尚验厂咨询 麦德龙Mattel验厂咨询 M&S玛莎验厂咨询 Argos验厂咨询 Bestseller验厂咨询 CK验厂咨询 GUESS验厂咨询 Boots验厂咨询 Macy's验厂咨询 BB&B验厂咨询 Asics验厂咨询 Abercrombie & Fitch验厂咨询 Casino验厂咨询 Saks验厂咨询 Nordstrom验厂咨询 HUGO BOSS验厂咨询 宝丽来验厂咨询 E-Mart易买得验厂咨询 Electrolux验厂咨询 Dollar General验厂咨询 NEXT验厂咨询 雅诗兰黛验厂咨询 Mattel美泰验厂咨询 星巴克验厂咨询 Nike验厂咨询 Coles Myer验厂咨询 Safeway验厂咨询 RPM验厂咨询 LTO验厂咨询 Bon-ton验厂咨询 ALDI(阿尔迪)验厂咨询 宝洁(P&G)验厂咨询 ZARA验厂咨询 Claire's验厂咨询 GAP验厂咨询 Arcadia Group验厂咨询 AEON永旺验厂咨询 Staples验厂咨询 PUMA验厂咨询 Burberry验厂咨询 Concept 4验厂咨询 Big Time验厂咨询 BestBuy验厂咨询 Hasbro(孩之宝)验厂咨询 其它验厂咨询 优衣库(UNIQLO)验厂咨询 Tween Brands验厂咨询 GPC验厂咨询 SLCP社会劳工整合项目咨询 Justice验厂咨询 SANMAR验厂咨询 Autozone验厂咨询 Mothercare验厂咨询 ToysRUs验厂咨询 WILKINSON验厂咨询 E-TASC验厂咨询 Reebok验厂咨询 LV验厂咨询 TSC验厂咨询 飞利浦(PHILIPS)验厂咨询 FLA验厂咨询 ADEO安达屋验厂咨询 GMI验厂咨询 Floor&Décor验厂咨询 ANF验厂咨询 AGS&ICM验厂咨询 UVEX验厂咨询 Shopko验厂咨询 Amazon亚马逊验厂咨询 TCM(Tchibo)验厂咨询 ACCO验厂咨询 Pimkie验厂咨询 CTC验厂咨询 Mango芒果验厂咨询 Debenhams验厂咨询 Quiksilver验厂咨询 COC验厂咨询 BanDai(万代)验厂咨询 BeBe(碧碧)验厂咨询 Bernard(伯纳德)验厂咨询 Danfoss(丹佛斯)验厂咨询 Kmart验厂咨询 Simon西蒙验厂咨询 万宝路(Marlboro)验厂咨询 laundry品牌验厂咨询 DCK验厂咨询 ASDA验厂咨询 Ann Taylor安泰勒验厂咨询 Diesel(迪赛)验厂咨询 Esprit埃斯普利特验厂 Conforama验厂咨询 Family Dollar验厂咨询 Morrisons验厂咨询 RUSTA验厂咨询 B&Q百安居验厂咨询 CHICO'S验厂咨询 COLES GROUP验厂咨询 Kellwood验厂咨询 Aramark验厂咨询 Mervyns验厂咨询 Hallmark豪马验厂咨询 Kiabi凯家衣验厂 HBI&HANES验厂咨询 J.Crew验厂咨询 SCS沃尔玛反恐验厂 Contempo验厂咨询 Kappa卡帕验厂咨询 Timberland(添柏岚)验厂咨询 LEGO乐高验厂咨询 AMER SPORTS亚玛芬验厂咨询 HBC哈德逊湾验厂咨询 JAG琼斯验厂咨询 UMBRO茵宝验厂咨询 POLO保罗验厂咨询 Liz Claiborne丽诗加邦验厂咨询 PetSmart验厂咨询 OTTO-HERMES验厂咨询 Walgreen沃尔格林验厂咨询 Joann store验厂咨询
本周热门排行榜
WRAP证书的级别是如何约定的?

WRAP认证分为白金、黄金和银级证书;获得每个级别证书都有一定的要求以及一些WRAP认证决不能出现的不符合,以下分别进行说明: 白金证

什么样的条件下可以申请BSCI的验厂?

工厂如果要申请BSCI验厂,必须有几个条件 1.您的客户必须是BSCI的会员之一,目前BSCI有800名左右的会员(截止2012年8月

Disney验厂要求的FAMA有什么作用?

迪斯尼FAMA产生的背景和作用 主要是现在出于全球反恐的考虑,美国是不允许

Sedex供应商如何发布Sedex验厂报告?

图文详解Sedex的供应商如何登陆系统发布自己的Sedex验厂报告: 1) 首先登录系统:https://sedexadvan

社会责任审核如何判定建筑工程的竣工验收?

引申:房产证能代替建筑工程验收合格证吗? 房产证是指权属人通过自建、交易取得建筑的合法所有权,可依法对建筑行使占有、使用、收益和处分的

社会责任审核如何判定建筑工程的消防验收?

●建筑工程消防验收总结: 1)针对劳动密集型企业,总建筑面积超过2500平方米的生产加工车间,总建筑面积超过1000平方米的宿舍楼,需

微信扫一扫

  • 13524304356
  • 13733822601